Installing a Drywall Partition: Wizard Tips

31.08.2019 House, Repair
Installing a Drywall Partition: Wizard Tips

Starting a redevelopment in an apartment or a house is a serious and responsible step. During this process, various building materials can be used: brick, aerated concrete, drywall. The option with GCR is easy to use, with its help the re-planning process will take much less time than with other materials. He has many positive qualities. How to install a drywall partition will be discussed later.

Features of drywall

Drywall is very popular in the market. It is used for decorating the ceiling, leveling walls, in individual decorative design, as well as when creating room partitions. The wide scope is due to its positive qualities.

Plasterboard partition.

More recently, this material has appeared on the market. Domestic builders learned about it about 25 years ago. Before that, it was used only in the West. Massively apply this material in the construction of steel not so long ago. Its use facilitated the process of redevelopment. Before that, only bricks were used for such purposes.

This material is very easy to install, so installing your own plasterboard partitions with your own hands is a much easier and faster process. It is also used for the construction of interior elements. Using this material, finishes of any shape are created. Even a novice can do work with these sheets.

Installation of drywall partitions is a redevelopment of a quick type. You can also easily select material for any room. Moisture-resistant, ordinary, heat-resistant, strong (reinforced fiber) gypsum board goes on sale.

It can be noted that the construction of GKL partitions does not exert strong pressure on the overlap due to the lightness of this material. Moreover, its cost is low. The material presented is environmentally friendly. This factor is also important.

Profile for the frame

Installing a drywall partition is a simple matter. Therefore, almost everyone can build it. But before that, consider the technology of the process and the recommendations of specialists.

Profile for the frame

For the GKL partition, you need to construct a metal frame. It is being built using a partition profile. The stores offer a huge assortment of similar structural elements.

Two types of profiles are used for this. Rack (PS or CW) or guide (PN or UW). They differ in size and scope. During the construction of the frame, they will need a lot. So before you start, you need to calculate the number of structural elements.

Profile (PN) is available in 4 sizes. He is the guide. It shows the numbers after marking the PN, which indicate the width of the element. They have sizes 50, 65, 75 and 100 (these numbers are presented in millimeters). This is the width of the cross section of the profile. The height of the rectangle to be produced on the slice is 40 mm. The length of the PN profile, as a rule, is 3 meters.

The maximum length of the rack profile reaches 4 meters as a standard. You can’t build it up. If you need a larger size if necessary, then a special order is issued at the manufacturing plant.

If we are talking about an interior partition, then you do not need to take a profile of 50 or 65 mm wide. He is weak for these purposes. It is recommended to use the PS-100 and PN-100 profile. Then the thickness of the partition will be 12.5 cm. This should be taken into account when creating the floor plan. If it is not possible to make a partition with such a profile, then it is minimally allowed to select structural elements 75 mm wide. Then the wall thickness will be 10 cm.

Preparatory work

Before zoning is created, the design of the room is done. This work is not difficult for the builder. But for a beginner, of course, it is recommended to be more careful during the calculations. The wizard draws a drawing of the room on a scale paper. Then he selects a suitable place for the erection of the wall. You should also pay attention to whether there will be an installation of an interior door in a drywall partition. If lockers are to be hung on the wall, or any elements using the fastener, special jumpers are installed in the right places.

Expert Advice

Creating a drawing is necessary in any case. This will help to correctly consider the stages of the work, several options for zoning and the exact determination of the desired material and its quantity.

Installing the door in a drywall partition is painstaking work. Therefore, follow this moment well to calculate and acquire the necessary material in accordance with the calculations. It is necessary to use the PN-100 and PS-100 profile. The list should also include sealing tape and chopping cord. Drywall sheets should be 12.5 mm thick. During the work should use the level. For such purposes, it should be two-meter.

A sickle is also purchased, which is used to seal joints when interacting with special putty. But you can purchase the KNAUF Uniflot construction mix. It seams up without a sickle. But its price is much higher.

During the work, you should also have at hand a hammer, tape measure, puncher, screwdriver, scissors for metal and a knife for drywall. Self-tapping screws for metal, acrylic primer and soundproofing material are bought. You should buy spatulas (wide, narrow and for finishing corners).

Layout

When installing the plasterboard partition, you must first mark the room, which was previously written in a notebook or simply on a sheet of paper. Mostly partitions are made with a door. The desired distance is measured from the starting wall using a tape measure. Marks are drawn along the side walls and two vertical lines are drawn. Then they are connected along the floor and ceiling.

For this, the master uses a chopping cord. It is set between two marks, a little delayed and released. The result is a flat line. Then 10 or 12.5 cm departs from it. It depends on the project.

Mark the doorway. A strong profile should be purchased for him. This construction is being constructed simply. Another rack is inserted into one rack beam. They are fastened with metal screws.

It should be noted that the door frame is installed in a drywall partition by a reinforced profile. Used PS-100, which is able to withstand the weight of the canvas in 40 kg. Therefore, it is required to perform a frame of reinforced elements. Typically, the width of the door leaf is 80 cm. In this case, the opening is made wider by 8 cm. After applying and re-checking the markings, you can install the profile.

Expert advice

Is the installation of a drywall partition a redevelopment? and is it legal? Residents of many apartments ask themselves this question. The Housing Code of the Russian Federation (in Article 25, part 4) shares the concept of "reorganization" and "redevelopment" of living space. If during the redevelopment the bearing walls were not demolished and the communication systems were refitted, then no permission is required to receive construction work.

Installing a drywall

If you need to make zoning because of the need to arrange a separate living room, then drywall is used. Before installing, do not finish the walls. Over time, all the space in the new room will need to be covered with putty, and then decorative finish.

Often the walls in the room are uneven. The differences can be several centimeters. Therefore, you should carefully measure the walls on the ceiling and floor. Otherwise, a curved partition may result. Experts recommend that you do not neglect this advice.

You should adhere to the established sequence of actions when installing a drywall partition. The first marking line on the wall is required to align the profile of the PN. The thickness of the selected drywall (2.5 mm) is added to the marking. A putty layer is applied to the fastened sheets, this also needs to be taken into account in the calculations.

The rack profile is cut so that it is one centimeter shorter than the ceiling height. This should be remembered when cutting in the process of preparing the material used. A stiffener is defined on the PS profile. With this edge, it will be mounted where the cladding is performed. You need to understand that the stiffener should be directed to where the beginning of the GKL skeleton sheathing will be made from.

Installation of a profile

Then install the profiles. This is nothing complicated. First, marking is made for holes in which the profile is fixed with dowels. Then it is applied to the wall, the created markup is transferred. Then they remove it and use a hammer drill or puncher to make holes in the marked areas to the desired depth.

Next, the sealing tape is glued to the profile. Usually it is self-adhesive. Her presence is obligatory. The profile is fixed at the edges. Then install dowels with an interval of 50-80 cm.

The choice of fastening still depends on the base material. If the building is concrete, then 7.5 cm dowels are needed, and if it is wooden, then 5 cm long self-tapping screws are needed. When installing the partition in a brick house, 10 cm dowels are used.

After the installation of the guide profiles, the rack elements are mounted frame. The first of them should be tightly fixed to the wall. He also goes into the guide profile and is fixed by self-tapping screws or notch. And in order to ensure good sound insulation of the structure, it is necessary to glue the profile with sealing tape. Also, all metal parts of the frame should be constantly checked by building levels to avoid uneven mounting.

Covering the frame

Next, the installation of the racks continues. Compliance with step-by-step instructions allows you to do the task correctly. The profile is recommended to be placed in increments of 40-70 cm in order. It should also be borne in mind that the edges of the GCR should fall in the middle of the profile. This will give the frame the required strength. Each rack is secured by a notch to the guide structures.

Installing the door in a plasterboard partition

Next, the doorway is arranged. The design involves the installation of jumpers. Rack profiles should initially be mounted taking into account the creation of a doorway. Since it is wide, the door leaf is fastened to it. The racks are reinforced with a beam.

Setting the profile

Next, you will need to put a jumper. It does not matter whether the installation of the sliding door in the plasterboard partition will be carried out or the installation of the canvas is planned. It should match the height of the doorway. A piece of profile is cut off. It should be 20 cm longer than the opening. The side edges of it are cut off. Then the profile is bent. From the side it looks like ears. The design will resemble the outward letter “P”. And the sides should have a length of 10 cm. For these sections, it is attached to the rack profiles. The crossbar is fixed with screws inside the opening. Over time, when sheathing occurs, drywall sheets are mounted there.

Then, a couple of rack profiles are installed over the crossbar . They are arranged in 40 cm increments and fastened with self-tapping screws. The distance between the rack profiles and the slats above the partition is also taken into account. When the structure is assembled and the door is partially installed in the drywall partition, proceed with the plasterboard facing.

Sliding doors

This building material is well suited for installing the sliding door in the drywall. Thanks to the GCR, you can make a suitable gap for the sliding door.

Before installing the frame for the wall, make sure that after installing the sliding doors nothing will impede their movement. Safety is also important. Often, a wall outlet, a switch, a lamp or simply create wiring is installed in the erected wall. This is extremely undesirable if the installation of a sliding interior door in a plasterboard partition is completed. If this is necessary, you should very carefully calculate all the points. It is important that in no case the sliding door does not touch the electrical elements.

If there are carpeting in the room, it must be ensured that the fibers from this material do not fall into the mechanism of the lower guide elements of the doors, as this can lead to mechanism out of order in the future. Here are the rules you should rely on when installing a sliding door into a drywall partition. And then the design will last a long and high quality.

Facing

Gypsum plastering occurs only after the construction is completed. You can start on the right side. The first sheet will reach the doorway. On average, its width is 60 cm. The sheet should be prepared in advance, in accordance with the size of the structure.

The sheet is sewn with a distance of 1 cm from the floor and 0.5 cm from the ceiling. It is better to start mounting one sheet at the bottom then put the missing piece on top.

Docking of sheets should take place on the middle of the surface of the profiles. To do this, use a rack profile. An additional profile is mounted to the first sheet that has been installed on the frame. Then they mount the second sheet of drywall.

When sheathing the partition, the screws are mounted with an interval of 15 cm. For jumpers, the step will be less. The chamfer from the ends of the gypsum plaster is also cut off. In this case, the surface for the joints will be straight rather than rounded.

Soundproofing and communications tab

During the installation of the partition, communication systems are often installed to guide them to the separated part of the room. Before suturing the second side, lay an electric wire in it. This allows, for example, to install the switch in a drywall partition to make lighting in the second half of the room.

A hole with a diameter of 35 mm is made in the wall. A corrugated pipe is laid there and a wire is passed through it. It is located in the center of the frame. Also make a hole for the switch for lighting. A chandelier or lamp is mounted on the wall in the right place.

Insulation of the insulation

You can also put mineral wool in the partition. It is environmentally friendly, so it can easily be used in residential premises. Often this is done to increase sound insulation. Mineral wool is well suited for this.

Completion of construction works

In the process of completing construction work, the second half of the structure with all the elements embedded in it is sewn up. Then GKL puttying is carried out. Then the required decorative interior decoration is created. It can be painting, applying wallpaper or other cladding options.

Completion of construction work

If you adhere to all the above recommendations, then the do-it-yourself mounted construction will serve for many years.

source

Comments

Tips from iHow

do not miss new and useful recommendations from experts

NEW
  • DIY magnetic stirrer: description, required materials
  • A magnetic stirrer is necessary for those who like to do various chemical experiments. With the help of this device, various ideas can be translated ...

  • Homemade hiking: interesting ideas
  • How to disconnect neodymium magnets without a special tool at home?
  • Do-it-yourself grate: materials, design, stages of work
  • Valve expander. How to do it yourself
  • shares